Tung Oil as a Concrete Finish?

We are planning a building that will be a short-term residence and my
long-term workshop. I have been looking at several concrete floor finishes
including epoxy and others.

Our son recently mentioned one I would have never thought of. He is a
construction supervisor building a large shipping depot in Northwest
Arkansas. It is a 70,000 square foot building with 147 overhead doors, lots
of automated conveyer equipment and a maintenance area. They finished all
of the concrete floors with a 30% Pure Tung Oil and 70% Kerosene mixture.
Two coats in the low traffic areas and three in the maintenance areas. He
said it provides a slightly greenish smooth surface.

I have been Googling this subject with mixed results. Does anyone have
first hand experience with using this process on a home shop floor.

RonB


This topic has 1 replies

TD

"The Davenport's"

in reply to "RonB" on 15/11/2007 7:29 PM

15/11/2007 7:59 PM

> We are planning a building that will be a short-term residence and my
> long-term workshop. I have been looking at several concrete floor
> finishes including epoxy and others.
>
> Our son recently mentioned one I would have never thought of. He is a
> construction supervisor building a large shipping depot in Northwest
> Arkansas. It is a 70,000 square foot building with 147 overhead doors,
> lots of automated conveyer equipment and a maintenance area. They
> finished all of the concrete floors with a 30% Pure Tung Oil and 70%
> Kerosene mixture. Two coats in the low traffic areas and three in the
> maintenance areas. He said it provides a slightly greenish smooth
> surface.
>
> I have been Googling this subject with mixed results. Does anyone have
> first hand experience with using this process on a home shop floor.
>
> RonB

I've used boiled linseed oil on a concrete floor...pretty spendy, really,
but it was a great looking floor for at least 20 years.

If I rememeber correctly, it was three coats...first was 2/3 solvent 1/3 BLO
and POUR it on and keep it wet for close to a day...I think we went with
about 18 hours. Let it dry for a few days.

Second coat was 1/3 solvent and 2/3 BLO and applied the same way...drying
takes a little longer with this coat.

Last coat is straight BLO...keep it wet for a couple hours, squeegee off the
excess, then let cure for close to a week.

Labor intensive as hell and not cheap, but DAMN, it makes for a wonderful
looking floor.

But no, I'll never do it again. twice was enough