... for the chair backs:
http://www.e-woodshop.net/images/CrftsManCh19.JPG
For those taking notes, beaucoup hours getting to this point:
Mill/Layout/Cut Parts on Cut List 24.25
Setup/route Mortises 32.00
Initial sand/surface preparation 11.75
Glueup 10.25
78.25
... or about 13 hours per chair thus far.
(Expensive wood (QSWO) makes for a careful fella ... and that's "spare"
time, folks ... during the month of 9/06, between putting the finishing
touches on one house, and getting another off the ground).
Gotta find something more relaxing to do for grins ... maybe pukey ducks, or
sleep?
Too bad that now the _real_ work starts ... final sanding and finishing.
(ugh!)
--
www.e-woodshop.net
Last update: 10/01/06
Sun, Oct 1, 2006, 9:17am (EDT-1) [email protected] (Swingman) doth showeth:
<snip> For those taking notes, <snip>
Nice. What color you gonna paint 'em?
Notes, notes? Nobody said anything about notes. Will there be a
test? Damn.
JOAT
It's not hard, if you get your mind right.
- Granny Weatherwax
"J T" wrote in message
> Sun, Oct 1, 2006, 9:17am (EDT-1) (Swingman) doth showeth:
> <snip> For those taking notes, <snip>
>
> Nice. What color you gonna paint 'em?
I was thinking something along the lines of that pearlescent automobile
paint, in maybe Mercedes anthracite grey?
> Notes, notes? Nobody said anything about notes. Will there be a
> test? Damn.
That's OK, old man. You're exempt ... at our age the only test we have to
keep passing is our physicals.
--
www.e-woodshop.net
Last update: 10/01/06
"C&S" wrote in message
> To be fair, I think you ought to include prototype time.
I've pretty well chalked up the time for the prototype as a "small shop
production run" education. If the opportunity arises to amortize that R&D
time, I'll try to do it over several projects
>Even so, I don't
> find that time estimate to be out of line at all.
That was not an estimate, but _actual_ time spent to that stage ... to the
quarter hour.
I have kept a very accurate account of the time it takes to do this set of
six in the event I need to price it out in the future, and have a much more
detailed, task oriented, time sheet than what I posted.
>If you don't mind my
> asking what's you wood bill look like for this?
The Cutlist Plus price breakout is a shade less than $1K for material
(QSWO).
That said, I was lucky enough to have a good deal of 5/4 left over from
previous projects, and purchased an additional 65 bf of 8/4 @ $6.15/bf ...
mostly for leg material and the back rest rails. I might have to get a
little more to finish out the seats before all is said and done.
> Having just finished my table. I need to start thinking about the chairs
> too.
Had I spent less time thinking and more time doing, I'd of been finished
with these chairs about a year ago.
--
www.e-woodshop.net
Last update: 10/01/06
"John L. Poole" wrote in message
> I visited your site to get more detail on the reproduction chair
> project, very impressive and inspiring, as well as a dose of reality of
> how long it takes to make something.
Thanks for the kind words, John.
> Your prototype was stained? Have you considered fuming -- I think you
> ought to at least try fuming, if you already haven't, to see if you
> notice a difference in the appearance.
The prototype was made from poplar ... fuming requires tannin to work its
magic, so there would indeed be a big difference in appearance. ;)
Actually, the finish on the _real_ chairs will be dictated by the finish on
table that goes with them, which was not fumed due to lack of space to do
something that big easily/safely.
They will, however, come close to matching some fumed pieces that I have
previously done ... it is surprising how close you can get to a fumed look
with ZARS Provincial 114 as a departure point.
<snip>
> I wish I had 80 hours!
Let's hope you do ... unless you're planning on not being around after the
next 3 1/4 days. :)
--
www.e-woodshop.net
Last update: 10/01/06
Nice chairs..! Amount of hours seems reasonable to me..
How did you get the curve in upper rail on the back of the chair? Bend,
laminate or just bandsaw cut..? Nice to have a place near you that sells so
much 8/4 QSWO. Place near me thinks 5/4 is sufficient for any project..
"Swingman" <[email protected]> wrote in message
news:[email protected]...
> ... for the chair backs:
>
> http://www.e-woodshop.net/images/CrftsManCh19.JPG
>
> For those taking notes, beaucoup hours getting to this point:
>
> Mill/Layout/Cut Parts on Cut List 24.25
> Setup/route Mortises 32.00
> Initial sand/surface preparation 11.75
> Glueup 10.25
> 78.25
>
> ... or about 13 hours per chair thus far.
>
> (Expensive wood (QSWO) makes for a careful fella ... and that's "spare"
> time, folks ... during the month of 9/06, between putting the finishing
> touches on one house, and getting another off the ground).
>
> Gotta find something more relaxing to do for grins ... maybe pukey ducks,
or
> sleep?
>
> Too bad that now the _real_ work starts ... final sanding and finishing.
> (ugh!)
>
> --
> www.e-woodshop.net
> Last update: 10/01/06
>
>
Swingman wrote:
> ... for the chair backs:
>
> http://www.e-woodshop.net/images/CrftsManCh19.JPG
>
> For those taking notes, beaucoup hours getting to this point:
>
> Mill/Layout/Cut Parts on Cut List 24.25
> Setup/route Mortises 32.00
> Initial sand/surface preparation 11.75
> Glueup 10.25
> 78.25
>
> ... or about 13 hours per chair thus far.
>
> (Expensive wood (QSWO) makes for a careful fella ... and that's "spare"
> time, folks ... during the month of 9/06, between putting the finishing
> touches on one house, and getting another off the ground).
>
> Gotta find something more relaxing to do for grins ... maybe pukey ducks, or
> sleep?
>
> Too bad that now the _real_ work starts ... final sanding and finishing.
> (ugh!)
>
I visited your site to get more detail on the reproduction chair
project, very impressive and inspiring, as well as a dose of reality of
how long it takes to make something.
Your prototype was stained? Have you considered fuming -- I think you
ought to at least try fuming, if you already haven't, to see if you
notice a difference in the appearance. I think having spent such amount
of your time to create what will be heirlooms deserves the extra time it
would take to make such a determination. And don't forget to stamp 'em
with you name/brand mark and year.
I wish I had 80 hours!
"Jim Hall" wrote in message
> Nice chairs..! Amount of hours seems reasonable to me..
Thanks.
> How did you get the curve in upper rail on the back of the chair? Bend,
> laminate or just bandsaw cut..?
Both crest and intermediate rails have the same radius, done with "just" a
bandsaw cut.
The radius necessitates 2 1/4" thick material to make the cut. Since QSWO
limits out at 8/4 rough, it takes a glue-up to get the required thickness.
An added benefit is that the curved bandsaw cutoff's make very nice curved,
drawer fronts.
> Nice to have a place near you that sells so
> much 8/4 QSWO. Place near me thinks 5/4 is sufficient for any project..
The new places around here (Houston) seem to have that attitude. However,
there is one hardwood lumber dealer who's been around since the 50's who
always seems to have a supply of rough 8/4 FAS, although you wouldn't know
it if you didn't know who to ask, or where to look.
--
www.e-woodshop.net
Last update: 10/01/06
"Swingman" <[email protected]> wrote in message
news:[email protected]...
> ... for the chair backs:
>
> http://www.e-woodshop.net/images/CrftsManCh19.JPG
>
> For those taking notes, beaucoup hours getting to this point:
>
> Mill/Layout/Cut Parts on Cut List 24.25
> Setup/route Mortises 32.00
> Initial sand/surface preparation 11.75
> Glueup 10.25
> 78.25
>
> ... or about 13 hours per chair thus far.
To be fair, I think you ought to include prototype time. Even so, I don't
find that time estimate to be out of line at all. If you don't mind my
asking what's you wood bill look like for this?
Having just finished my table. I need to start thinking about the chairs
too.
-Steve
On Sun, 1 Oct 2006 09:17:09 -0500, "Swingman" <[email protected]> wrote:
>... for the chair backs:
>
>http://www.e-woodshop.net/images/CrftsManCh19.JPG
>
>For those taking notes, beaucoup hours getting to this point:
>
>Mill/Layout/Cut Parts on Cut List 24.25
>Setup/route Mortises 32.00
>Initial sand/surface preparation 11.75
>Glueup 10.25
> 78.25
>
>... or about 13 hours per chair thus far.
>
>(Expensive wood (QSWO) makes for a careful fella ... and that's "spare"
>time, folks ... during the month of 9/06, between putting the finishing
>touches on one house, and getting another off the ground).
>
>Gotta find something more relaxing to do for grins ... maybe pukey ducks, or
>sleep?
>
>Too bad that now the _real_ work starts ... final sanding and finishing.
>(ugh!)
Good looking chairs. Also solid looking.
I wouldn't worry too much about the time input. I'm currently
building a breakfront china cabinet. Just passed the the 75% finished
point yesterday. Passed the 100% hour estimate some time ago. But it
is for personal use, the only financial implication being I don't have
to buy one.
And I concur, the final sanding and finishing are to be aproached with
dread and apprehension. The China cab has to match a table and chairs
that I did not finish and the factory is out of business so I can't
get their schedule. I must have 30 samples sitting around with
various finish schedules written on the back of them, and I'm still
not satisfied I have an acceptable match.
Hey, it is relaxing on any day when things go well. On those other
days, well......
Frank