The kiln is built and running. 2x2x8 with fan on one end and dehumidifier o=
n the other. No heat source installed as of yet but I have a heat lamp and=
a temperature control unit ready to deploy.
I have the dehumidifier set at 45% as a guesstimate as I couldn=E2=80=99t f=
ind any counsel on what the appropriate level should be. Your thoughts?
It=E2=80=99s been running about 4 hours and has pulled out about a cup of w=
ater. =20
I=E2=80=99m hoping to bring the moisture content down from around 22% to 10=
% or less in 8-10 weeks.
So ... in addition to the dehumidifier setting should I add the heat and wh=
at max temp should I shoot for?